Scope: Springwood High Basketball Court Makeover


The Challenge:
- Court surface was worn out, rough, and uneven.
- Significant built-up residue, including chewing gum, needed removal.
- Previous line markings were faded and required elimination.
- The surface required extensive preparation before new line marking could be applied.


The Solution:
- Extensive concrete grinding to remove all chewing gum, built-up residue, and previous line markings.
- Created a smooth, even, and polished surface for better performance and durability.
- Applied sealing and coating to protect the surface and enhance longevity.
- Used custom-made stencils for precision line marking, ensuring accurate court lines and curves.



The Outcome:
- Transformed the rough, worn-out court into a smooth, functional, and aesthetically pleasing surface.
- Achieved a professional and durable finish with high-quality line marking.
- Enhanced the overall performance of the basketball court, providing a safe and enjoyable environment for players.
- Long-lasting results, with the court now well-prepared to withstand heavy use and outdoor conditions.


